Arab Potash CompanyCompleted

Automated Container Loading System Optimization

Multidisciplinary engineering modifications to address recurring motion and position feedback failures in four automated loading trains.

Project figures

Loading trains addressed
4

Engineering challenge

Recurring failures involved wire ropes, mechanical damage, synchronization in the screw lifting system, and shortcomings in position sensor mounting.

Role and responsibilities

Planned and supervised equipment modifications and coordinated with mechanical and automation specialists. Supported testing and commissioning.

Technical approach

Proposed a pivot-based lifting arrangement to address synchronization-related failures and redesigned the lifting position sensor arrangement using fail-safe principles.

Execution

Coordinated installation and field testing of the equipment and instrumentation modifications with the relevant disciplines.

Results

The modifications were implemented across the loading trains and improved equipment maintainability and reliability.

Engineering lessons

Investigate motion mechanics and position feedback together when tracing recurring equipment failures.

Illustrative gallery

Illustrative industrial bulk loading equipment at a container bay
Generic illustration of industrial equipment.

Related projects